Skip to Main Content

Keller Lake Construction Update: February 2021

In just a few short months, residents will be moving into their brand new Keller Lake Apartment Homes. Construction crews have continued to work throughout the winter and the progress is quite remarkable as the new community is quickly coming to life!

Here are highlights of our construction progress:

  • Winter has officially arrived which naturally slows production down on interior work. Lucky for us though the majority of the work is currently taking place inside and is showing no signs of slowing down!
  • In building three we are well underway with finishes. 90% of drywall throughout the building has been completed and interior finishes are being installed inside every resident suite. The flooring, tile, and cabinets have really started to give the homes some personality! The gypcrete subfloor has been poured on the third floor. This serves as a great sound barrier that will limit the sound transfer between the second and third floors.
  • In building one the drywall finishing has begun on the first floor. On the second and third floors, mechanical electrical, plumbing, and fire protection contractors have all but wrapped up their rough-ins, and drywall hanging is underway.
  • In building two the mechanical, electrical, plumbing, and fire protection contractors are continuing work on their rough-ins on all three floors.
  • We’ve hit a big milestone and we were able to complete tying-in building two and building three. There is now access between the buildings without having to walk outside in the cold!

Thank you to EV Construction for continuing to go above and beyond to make this vision a reality.

Construction Update

The Future is Bright: Keller Lake Apartment Homes Opening Fall 2021

Opening in Fall 2021, our Keller Lake Apartment Homes feature 52 contemporary apartment homes with beautifully appointed finishes, balconies, and great spaces for entertaining. The expansion at Keller Lake is West Michigan’s first town-square model community, forming a tight-knit 62-and-better Life Plan Community bustling with activity. World-class amenities include peaceful lakefront walking paths, a fully-equipped wellness center, a piazza for gathering with friends, a bistro, a restaurant, and so much more.

Keller Lake represents the best of both worlds—tucked away in the beautiful Cascade area, close to shopping and Grand Rapids’ exciting city life.

New Ways to “Visit”

Hard Hat Tours

Hard Hat Tours

Every Other Tuesday at 3:00 p.m.

  • March 23
  • April 6
  • April 20

Enjoy a guided tour and see firsthand a completed model apartment home and other floor plans under construction. Your tour will be up-close (but physically-distanced)! You must register to attend.

Click here to register or call 616-278-6527.

Virtual Tours & Info Sessions

Virtual Tour & Information Sessions

  • Tuesday, March 23 at 10:00 a.m.
  • Wednesday, March 31 at 2:00 p.m.

Join us from the comfort of your own home, for a tour of Keller Lake and overview of the advantages of a Life Plan Community. Our virtual events are packed with great information!

Click here to register or call 616-278-6527.

Photos courtesy of EV Construction.

Share on social: