Even though the weather is getting colder, we have made big construction progress on our Keller Lake Apartment Homes. We are so excited to think that in less than a year, our residents will be moving into their new homes!

Here are highlights of our construction progress:

  • Framing has been completed on Building Two
  • Roofing is scheduled to arrive this month for Building Two– a huge win before winter.
  • Building Three has been enclosed and temporary heating is now in place which will allow the drywall to be completed. Flooring and casework finishes will be happening soon.
  • In Building One, the mechanical, electrical, plumbing, and fire protection contractors continue to work on their rough-ins for all three floors.
  • Outside Building One, exterior foam insulation and weather barriers have been completed.
  • In Building One windows and patio door installation are in progress.

A huge thank you to EV Construction for continuing to go above and beyond to make this vision a reality.

Your Next Great Chapter Begins at Clark at Keller Lake

Opening in Fall 2021, Keller Lake’s new, beautiful, community features 52 independent-living apartment homes. These contemporary apartment homes offer both one-bedroom and two-bedroom options.

Keller Lake gives you the best of both worlds — it’s tucked away in the beautiful Cascade area but is also close to shopping and Grand Rapids’ exciting city life.

Click here to schedule a virtual or private tour to see the Keller Lake Apartment homes or contact Melissa Guigue at (616) 247-9627 or Melissa.Guigue@clarkretirement.org.

Photo credit: EV Construction

Share on social: