It’s hard to believe that it’s only been a year since we broke ground on our Keller Lake Apartment Homes. We are so excited that this is the year our residents will be moving into their new homes. 

Here are highlights of our construction progress:

  • In building three, drywall finishing is in progress on all three floors and we are getting closer to beginning interior finishes.
  • In building one, drywall hanging has begun on the first floor. On the second and third floor, mechanical, electrical, plumbing and fire protection contractors continue to work on their rough-ins. Rough-in work is expected to finish in January. We are also now able to get temporary heat in this building.
  • In building two, we are about 90% enclosed from the elements now with windows in place and a roof installed. The last item to get us to 100% is installing patio doors. Once the doors are in, we’ll be able to fire up the temporary heat. On the lower floors, mechanical, electrical, plumbing, and fire protection contractors are continuing to work on rough-ins. 

Before you know it, it will be fall and the project will be complete! 

As always thank you to  EV Construction for continuing to go above and beyond to make this vision a reality.

The Future is Bright: Keller Lake Apartment Homes Opening Fall 2021

Opening in Fall 2021, our Keller Lake Apartment Homes feature 52 contemporary apartment homes with beautifully appointed finishes, balconies, and great spaces for entertaining.

The expansion at Keller Lake is West Michigan’s first town-square model community, forming a tight-knit 62-and-better Life Plan Community bustling with activity. World-class amenities include peaceful lakefront walking paths, a fully-equipped wellness center, a piazza for gathering with friends, a bistro, a restaurant, and so much more.

Keller Lake represents the best of both worlds—tucked away in the beautiful Cascade area, close to shopping and Grand Rapids’ exciting city life.